Medina · King County
Post-Construction Cleanup in Medina, WA
Debris removal and final detail that gets the building ready to hand over.
- WA Contractor
- HERITBS745D6 · active through 2028
- general liability
- $2,000,000 general liability · Farmers
- Credentials
- Certificate of insurance sent before the first visit
Medina renovations are large private homes with stone, custom millwork, and a great deal of glass, finished by trades who were chosen carefully. The final clean is the last thing anybody touches before the owner walks it, and the wrong product on the wrong surface at that stage is not recoverable.
About Medina
Medina is a small waterfront city on Lake Washington made up almost entirely of large private homes, many of them with staff, security arrangements, and specific rules about who enters and when. There is almost no commercial property here, so most of what we are called for is a renovation handover or a floor surface that needs the manufacturer method — stone, hardwood, custom millwork, a great deal of glass — exactly the kind a generic product will damage before anyone notices.
What post-construction cleanup covers

Post-construction is the only cleaning job with a deadline somebody else set. The certificate of occupancy, the tenant walkthrough, the open house — the date is fixed before we are called, and the clean is the last thing standing between the building and the people waiting for it.
Heritage does the full sequence: rough clean once the trades are out, then the final detail that actually gets inspected. Drywall dust out of tracks and returns, adhesive and sticker residue off glass and fixtures, paint flecks off hardware, and a floor that has been gone over enough times that it stops producing dust.
Priced per square foot after a walkthrough, with a $450 project minimum. Terms are Net 15. We quote the scope we can actually finish before your date rather than the number that wins the job and misses it.
Ideal for
- General contractors closing out a build
- Tenant improvement and office build-outs
- Retail and restaurant fit-outs before opening
- Renovations and unit remodels
- Developers preparing a handover walkthrough
What's included
- Construction debris and packaging removed from the space
- Drywall dust from ledges, tracks, vents, and returns
- Adhesive, sticker, and label residue off glass and fixtures
- Paint overspray and compound flecks off hardware
- Cabinetry and millwork cleaned inside and out
- Repeat floor passes until the surface stops shedding dust
Common questions
What is the minimum?
$450 per project. Below that the mobilisation costs more than the clean, and quoting under it would mean cutting the final detail — which is the part that gets inspected.
Do you do the rough clean and the final, or only one?
Either. Many contractors book both: a rough clean once the trades are out so the space can be worked in, then the final detail closer to the handover date. Booking both is usually cheaper than one heroic pass at the end.
Can you hit our certificate of occupancy date?
We will tell you honestly at the walkthrough. If the date does not leave room for the scope, we say so before you book rather than after. That is worth more to you than an optimistic yes.
Do you carry insurance for an active job site?
Yes. WA Contractor License HERITBS745D6 and $2,000,000 general liability aggregate through Farmers. We send the certificate to your GC or property manager before the first day on site.
Other services in Medina
Get a real quote, not a guess.
Tell us about the space and we will come back with a written scope and a number. No obligation, and no pressure if the answer turns out to be no.